Bronze Restoration—Private

Washington, DC
Submitted to Christman, Consigli, Grunley
Base Bid – Phase 1: $54,340.00
Option 1 – Phase 2: $301,660.00
Option 2 – Phase 3: $55,320.00
Option 3 – Phase 4: NO WORK
Option 4 – Phase 5: NO WORK
Option 5 – Phase 6: 296,000.00
UNIT COST #14
Clean and restore balcony metal railing (A427)
  • Phase 1
    
  • Unit of measure: 12 LF
    
  • Please note: this unit cost has NOT been included in the lump sum cost of Phase 1, above
    
    Per linear foot: $1,082.25
    			Extension: 12 LF x $1,082.25 = $12,987.00 TOTAL