Chad Shores
MSHP
Project Manager
Southeast
(786) 530-4243

Chad joined EverGreene in 2014, shortly after completing his master’s degree in Historic Preservation and Conservation at Columbia University. During his tenure with the company, Chad has worked on a variety of projects, ranging from conducting preliminary condition assessments of historic materials, to performing complete conservation treatments of significant historic resources.

He has a working knowledge of treating multiple historic architectural, artistic, industrial artifact materials and enjoys the unique challenges brought with each new project. Chad joined the Florida Association of Public Art Professionals (FAPAP) Board in May 2019 and is currently serving as Treasurer.

Chad holds a BA in History from Lee University, where he graduated Magna Cum Laude.

 

Projects.

Deer Sculpture Reset
Balustrade Reset
Copley Symphony Hall
New Synagogue Palm Beach
Old City Hall
Jacksonville Public Art Conservation
Kennedy Space Center T-38 Talon Aircraft
St. Paul's Episcopal Church
St. Andrew's Catholic Church
Great Court Ceiling
KSC Titan II Rocket Engine
KSC F-1 Engine Prototype
Saturn 1B Restoration
St. Vincent de Paul
First National Great Banking Hall
Pergola Dome Restoration
National Air and Space Museum Mural
St. Paul's Episcopal Church
West Point Grant Barracks
California Science Center A-12
CA Science Center Douglas DC-3-G202A
Arlington Cemetery Flagpoles
Jacksonville Public Art Assessment
Federal Building Limestone Facade Assessment
Tampa Theatre Auditorium Paint Study
West Virginia State Capitol Sculptures
Art Museum Gallery Wood Floor Restoration
Fleischmann Fountain
Cheekwood Fountain Treatment
Cornice Treatment
Swimming Pool Grotto Protection
Perez Art Museum Maintenance
U.S. Capitol Dome
Goldwater Memorial Hospital Murals
David Statue
Ringling Museum of Art - Ca' d'Zan